We are FCC - n20
More than 750 operational waste management facilities On the other hand, it has also been based on environmental sustainabili- ty, maximising energy efficiency, mi - nimising noise and odour emissions and with an architectural solution that seeks to reduce the visual impact of the facilities and ensures environ- mental integration into the surroun- dings. Finally, strong safety measu- res in terms of the environment and Occupational Risk Prevention will be implemented. The conception of the plant has also been based on environmental sustainability, maximising energy efficiency, minimising noise and odour emissions and with an architectural solution that seeks to reduce the visual impact of the facilities and ensures environmental integration into the surroundings fertiliser in accordance with the legal criteria established for this purpose. Total innovation The plant will preferably process all the digestate obtained at the Dehe- sas Biomethanisation Plant, from the organic fraction generated in Madrid, together with vegetable fraction from pruning, which will be used as a struc- turing material in the biological treat- ment process. The facility is divided into four areas: reception and feeding, biological treatment, refining and sto - rage of compost and dispatch. The conception of the plant has focu- sed on total innovation in maximising the level of automation and control over the production processes, so that from the unloading of the diges- tate to the collection of the highest quality compost there will be no ma- nual intervention by the operating per- sonnel. In 2020, FCC Servicios Medio Ambien- te managed 23.6 million tonnes of waste and produced nearly 3.3 million tonnes of secondary raw materials (SPM) and refu- se-derived fuel (RDF). The company has more than 750 operational waste mana- gement facilities, of which more than 200 are environmental complexes dedicated to waste treatment and recycling, inclu- ding 11 waste-to-energy projects with a capacity of 3.2 million tonnes per year and 360 MW of non-fossil electricity. I N N O V A T I O N 59 I N N O V A T I O N
Made with FlippingBook
RkJQdWJsaXNoZXIy NTQ2MjA=