We are FCC - n20

The construction project comprising civil works, building and installations of the Data Processing Centre, executed in Guadalajara by FCC Indus- trial, has enabled the FCC Group’s Construction area to achieve a milestone in infrastructure sus- tainability. During the development of the project, FCC In- dustrial carried out a detailed study of the waste fractions generated in the audited project, as well as its own flow, carrying out a redesign of pro - cedures and processes for its management, in a context of circular economy. In this way, FCC has become the first construc - tion company in Spain to obtain the Zero Waste certificate awarded by AENOR to those compa - nies that have a waste management traceability system that guarantees the recovery (reuse, re- cycling or energy recovery) of the waste it gene- rates. This procedure avoids its management by means of landfill. The AENOR Zero Waste certification, which re - quires the recovery of at least 90% of the waste generated with 100% of the waste included in the scope, was awarded to the company after achie- ving a recovery rate of 99.99%, which makes its management a success. Zero waste construction Commitment to sustainability Voluntary commitment to SDG integration and compliance This new Zero Waste certificate is in addition to the environmental (ISO 14001) and energy efficiency (ISO 51001) certifications that the company holds, along with the implementation of international seals, such as BREEAM and LEED, in its various pro- jects. All of this is proof of FCC Industrial’s commitment to sustainability, as one of the leading, cutting-edge companies in the sector. Data Processing Centre, built by FCC Industrial, in Torija (Guadalajara). WATCH TIME-LAPSE OF THE CONSTRUCTION OF THE CEN- TRE IN GUADALAJARA R E S P O N S I B I L I T Y 41 R E S P O N S I B I L I T Y

RkJQdWJsaXNoZXIy NTQ2MjA=