We are FCC - Nº18

FCC Construcción has completed the “Campus Airbus Futura” pro- ject in Getafe, Madrid. The project has been designed by Estudio Lamela Arquitectos and is pro- cessing the BREEAM certificate with a VERY GOOD rating, which shows a clear commitment to sus- tainability and innovation. The Company has executed a series of buildings with a similar aesthetic and consistent with the concept of “campus”. The main building is the “Central Offices” building in which the corporate headquarters of Airbus Spain is FCC Construcción completes the “Airbus Futura Campus” in Getafe (Madrid) The newAirbus corporate headquarters is one of themain non-residential corporate building infrastructures executed in Spain in recent years. located. The rest of the buildings are used for the corporate dining room, equipped to serve 3,000 meals a day; to the process of identification and security control, as well as to the surface parking with a basement called “Par- king P7”. The Shared Services building stands out, which has 4 office floors and an underground car park. The most characteristic thing about this building is its lar- ge precast concrete façade, which constitutes one of the most com- plex architectural and engineering challenges that this project has faced. construction B U S I N E S S 16 B U S I N E S S

RkJQdWJsaXNoZXIy NTQ2MjA=