We are FCC - Nº17
Alfilorios Reservoir , main stage of the water cycle in Oviedo (Asturias) Supplied by the waters of the Barrea river, a tributary of the Nalón river Aqualia supplies the central area of the autonomous community with the water stored in its 54 hectares of surface area and its 9 hm3 of capacity, treated in the Cabornio Drinking Water Treatment Plant (DWTP). T H E P L A C E 64
RkJQdWJsaXNoZXIy NTQ2MjA=