We are FCC - Nº17

who collaborated to improve the connectivity and accessibility of the different neighborhoods and streets of the capital. FCC Construcción, together with Convensa, was also responsible for restoring the various urban, conven - tional and high-speed rail connec - tions. In addition to cleaning and resto - ring various Metro de Madrid lines, FCC Construcción and Convensa worked on the conventional (Cerca - nías) rail network in Madrid, Toledo, Soria and Ciudad Real to optimise the return to normal services, which were badly affected by the snows - torm that devastated the center of the country. At the same time, both companies also enabled the res- toration and operation of the Ma- drid-Barcelona High Speed Line. The Mayor of Madrid , thanks FCC Construcción and Real Madrid for their involvement The Mayor of Madrid, José Luis Martínez Almeida, thanked FCC Construcción and Real Madrid for their involvement in cleaning the streets of Madrid. FCC Construcción has made available to the city all the machines available for cleaning the snow that fell after Filomena had passed WATCH THE VIDEO MADRID’S MAYOR THANKS FCC CONSTRUCCIÓN P E O P L E 29 P E O P L E

RkJQdWJsaXNoZXIy NTQ2MjA=